Charlotte Concrete Services tells every driveway customer the same thing: wait 7 days before parking a car on new concrete, and keep heavy trucks off for about 28 days. Walking is fine after a day or two.
Those numbers assume normal Charlotte weather. A cold stretch slows curing and may add days.
Here is what happens inside the slab that week.

Get a FREE Quote
Concrete hardens through hydration, a cement-and-water reaction that runs for weeks. Our schedule for a new residential slab in mild weather: We follow the strength-based approach in the FHWA curing guide before telling you it is safe to park on your new driveway.
Concrete driveway edges are weakest, so keep tires off them the first month.
The American Concrete Institute sets a minimum curing period of 7 days for ordinary cement, or until the concrete reaches 70 percent of its specified strength. By then a cured slab carries a car.
Engineers specify strength at 28 days, when the slab reaches design strength and we allow heavy loads.
ACI notes the reaction roughly doubles per 18 degrees Fahrenheit rise; concrete at 50 degrees gains strength at about half the rate of concrete at 73.
July highs near 90 degrees make slabs gain strength fast; the risk is drying too quickly. We pour early, keep the surface moist or under curing compound, and still hold 7 days.
January lows average near 32 degrees. We will not pour with lows forecast below 40, we blanket fresh slabs, and the no-car window can stretch to 10 days or more.
Spring and fall cure most steadily. See why concrete cracks in Charlotte for how curing ties into cracking.
Most Charlotte driveways end at an apron in the city right-of-way, built under a CDOT driveway permit, and it is the first spot a garbage truck clips. We barricade it and ask you to keep carts off it.
Plan big deliveries around day 28, since moving trucks and dumpsters can crack a young 4-inch slab. For street rules, see driveway permits in Charlotte.
A concrete patio takes foot traffic in a day or two and furniture after a week; hot tubs wait for full strength.
A concrete slab for a shed can take framing a few days after the pour, but vehicles wait the same 7 and 28 days. A walkway is ready in a couple of days.
No rock salt or deicers the first winter, no power washing until full strength, and keep downspouts off the new edges.
Small shrinkage cracks along joints in the first week are normal; anything bigger, tell us.
We set the pour date around the weather and write out when you can walk, park and drive. Request your free estimate.