Charlotte Concrete Services replaces and expands driveways, pours patios and walks, levels sunken slabs and builds heavy-duty pads in Indian Trail, with a written price after a site visit.
Indian Trail is a Union County town that grew from 11,905 residents in 2000 to 39,997 in 2020, mostly in subdivisions built since the late 1990s. Builder-grade driveways from that boom were poured thin on Piedmont clay, and many are now cracked or sunken.
We take jobs along US 74, Indian Trail Road and Old Monroe Road. Back toward I-485, we also pour in Pineville.

Get a FREE Quote
The town's driveway expansion rules decide how big your new concrete can be.
Expansions must be a permanent, non-erodible surface: poured concrete, pavers or asphalt.
No more than 35 percent of the front yard may be used for parking, so we measure the front yard on site.
Many subdivisions require concrete rather than asphalt, so most owners pour the whole driveway at once.
The town charges a $30 fee and wants a plot plan with dimensions. Its Engineering Department meets us on site before the pour.
The housing is mostly one era, so the problems repeat.
Aprons sloping toward the garage collect water, so we regrade and repour them with a trench drain where needed.
Loose backfill lets walks and stoops drop. If the slab is intact, concrete leveling lifts it; if broken, we replace it.
Our concrete driveways run $10-$16 per square foot with removal, about $6,000-$9,600 for 600 square feet, on a compacted 4-inch graded aggregate base.
A broom-finished patio runs $7-$11 per square foot, about $2,100-$3,300 for 300 square feet.
Shops and warehouses line US 74 and Indian Trail Road.
Our loading docks and equipment pads are designed for the real forklift and trailer load and quoted from plans.
We schedule storefront work to keep entrances open.
Indian Trail sits on typical Piedmont ground southeast of Charlotte.
Red clay over weathered rock sometimes hides hard material, so we probe footings during the estimate.
Loose clay settles, so we never pour on spoil; soft spots get replaced with compacted stone.
Crooked Creek runs through town, and creek-side lots change the layout.
Questions we hear often.
If it stays within the 35 percent front-yard limit, usually yes.
It might; covenants can govern materials and width, so check yours.
Seven days for cars; design strength comes at around 28 days.